Concrete Leveling Marketing and the Cost of the Drive
By Luis Johnson, founder of Lunere Digital
Concrete leveling marketing is a routing problem wearing a marketing costume. On most jobs in this trade the drive, the setup and the teardown cost more than the material does, so the thing you're buying with an ad budget isn't awareness. It's a short drive to a slab big enough to bother with. Get that right and a thin ticket works fine, because you can do several in a day. Get it wrong and you'll spend a season quoting sidewalk squares forty minutes from the yard.
The short version
- Price per square foot is steady, so the whole job value depends on how much slab there is.
- Small jobs clustered close together beat big jobs spread across a county.
- The season is short in cold markets, so spending should be front-loaded rather than even.
- Set a square footage floor on the form or your estimator will spend the summer on steps and single squares.
- The table below is how I'd route an incoming job before anybody gets in a truck.
Which slabs are worth the truck?
Bob Vila breaks leveling work out by what's being lifted: driveways at $600 to $3,000, garages at $500 to $2,500, patios at $500 to $1,100, sidewalks at $150 to $800, and steps at $200 to $600. Fixr frames the same work as $500 to $1,700 per 100 square feet.
Put those side by side and the routing rule falls out on its own. Here's how I'd read an incoming job before committing an estimator to it. Your own numbers will move the lines, so treat the right column as the shape of the decision and not as your policy.
| What they want lifted | Published job range | How I'd route it |
|---|---|---|
| Driveway, multiple panels | $600 to $3,000 per Bob Vila | Take it anywhere inside your normal radius. This is the job that pays for the day. |
| Garage floor | $500 to $2,500 per Bob Vila | Take it, and ask about the apron and the driveway in the same call, because they usually settled together. |
| Patio or pool deck | $500 to $1,100 per Bob Vila | Worth it close in. Further out, only pair it with a second job the same morning. |
| Sidewalk or walkway | $150 to $800 per Bob Vila | Core ZIPs only, and set a square footage floor so a two-slab trip hazard never books on its own. |
| Steps or a single stoop | $200 to $600 per Bob Vila | Don't book it alone. Either attach it to another job on the street or quote it over the phone. |
| Interior floor before new flooring | $500 to $1,700 per 100 square feet per Fixr | Ask the square footage before anything else, because the range on this one is wider than the whole rest of the table. |
Density beats reach
The old yard sign habit in this trade isn't nostalgia, it's good economics. Neighborhoods settle together because the fill, the drainage and the build year are the same for the whole street. So the cheapest next customer you'll ever get is three doors from the last one.
Advertising should copy that rather than fight it. Tight ZIP targeting, a square footage floor on the form, and appointments grouped into mornings. A campaign that brings you twelve appointments spread over four counties is worse than one that brings you seven in two neighborhoods, even though the first report looks better.
There's a second habit worth keeping from the sign era. When you're already on a street, ask the homeowner which neighbors have the same dip in the driveway, because he has walked past all of them and he knows. A name and a house number from somebody who just watched your crew work is a warmer appointment than anything I can buy you, and it costs the length of one conversation at the end of a job.
A short season changes the spending plan
Most lifting wants ground that's not frozen and conditions that aren't soaking, so a northern shop has a working window and a southern shop mostly doesn't. The way I see it, that argues for front-loading: spend hard from the thaw through the first dry stretch, keep it steady through the summer, push again in the autumn when people are getting the driveway right before winter or putting the house up for sale.
What I'd not do is divide the year into twelve equal parts. A dollar spent in February in Minnesota books an appointment nobody can service, and the homeowner who waits eight weeks will have called somebody who answered in April.
Can I stop the small jobs reaching my calendar?
Yes. You set a square footage floor and a slab type list, and anything under either one is rejected on the form before a calendar ever opens.
What about commercial slab work?
Different buyer, different cycle, and this is built for homeowners. If commercial is most of your revenue, say so on the call and I'll tell you straight if this fits.
How do I compare this to yard signs?
On cost per attended appointment, counted the same way for both. Signs will usually win on price and lose on volume, which is why most shops end up running both.
Sources
Read next
- The Foundation Fix Pipeline, Step by StepHow a homeowner with a cracked wall becomes a dated inspection on your calendar: the ads, the form, the one minute callback, the booking and the reminders.
- Every Homeowner Is Yours AloneWhat exclusive actually means when somebody sells it to you, how to check a vendor is telling the truth, and why the ad account being yours is the real test.
- Break-Even Calculator for a Booked InspectionThe most you can pay for one booked inspection before the job stops paying, worked out from your job value, margin, show rate and close rate.
- You Only Pay When a Job Signs$0 to start, no setup, no retainer, no fee per lead. You pay a share of each job that signs from a homeowner I booked, after the deposit clears. Ads go on your own card.
- Pier and Beam Foundation Repair LeadsHalf the homeowners who call don't know what their house sits on. How pier and beam foundation repair leads get sorted before your estimator drives out.
- Fake Leads, Wrong Numbers and Forms Nobody Filled InDisconnected numbers, renters, homeowners who never filled in a form. How to tell fake leads from stale ones, get the credit, and stop buying either kind.
- Reading a Lead Gen Contract Before You Sign ItThe nine clauses that decide what a lead agreement really costs you, what each one usually says, and the single question to ask about it before signing.
