Skip to content

What Close Rate Should a Foundation Repair Shop Expect?

By Luis Johnson, founder of Lunere Digital

There's no audited industry figure for foundation repair close rate. What you'll find are vendor claims: LeadsuiteNow says a trained inspector who diagnoses, shows visuals and offers financing closes 35 to 55 percent of inspections, while Minyona uses a 15 percent close rate on leads in its own cost example (both read November 17, 2026). Treat both as claims, not benchmarks.

They also measure different things, which is why they look so far apart. The number that helps you is your own, measured the same way every month.

The short version

  • Published figures are vendor claims, and none of them is audited.
  • Close rate on leads and close rate on held inspections are two different numbers.
  • A shop can close 15 percent of leads and 35 percent of inspections in the same month.
  • What moves the inspection number: the decision maker in the room, a written estimate that day, and financing on big jobs.
  • Track both rates by source, or you can't tell a lead problem from a sales problem.

Published claims, side by side

Who says itThe figureWhat it measuresRead it with
LeadsuiteNow, April 2026 article35 to 55 percentInspections closed by a trained diagnostic consultantAssumes a strong closer and financing on hand
Minyona, foundation repair leads page15 percentLeads that become jobs, used in a cost exampleAn example input, not a measured average
Minyona, appointment setting page25 percentAppointments that close, from a window contractor exampleA different trade
Every figure here is a published claim from a company that sells marketing. None is audited.

Owners mix up two different rates

Lead to signed job counts every form and call. Inspection to signed job counts only the houses your estimator actually stood in. The first is always lower, because it carries every wrong number, every homeowner who never picked up and every no-show.

Here's how one shop can hold both numbers at once. 100 leads, 45 of them held as inspections, 15 signed. That's 15 percent of leads and 33 percent of inspections, and both are true. When somebody quotes you a close rate, ask which one before you compare.

Why do shared leads close lower?

Because the homeowner has already heard from other shops by the time you call, so he's comparing who picked up first and then who's cheapest. The way I see it, that pushes your lead-to-job rate down and tilts the inspections you do get toward price shoppers. An exclusive homeowner who booked himself is a different conversation, because nobody else is in his kitchen that week.

What moves the number at the kitchen table

Things that tend to lift inspection close rate

  • Everyone who decides is home for the inspection, spouse included.
  • The estimator shows the homeowner what he found, with photos or a level, before talking price.
  • A written estimate is left the same day, not emailed next week.
  • Financing is offered on big jobs. LeadsuiteNow calls it critical for projects of $15,000 and up.
  • The homeowner gets a call or text within two days of the visit.
  • Somebody tracks why each lost quote was lost, in one word.

Reading your own numbers

Lead-to-job is low but inspection-to-job is healthy
The leak is before the house: answer speed, booking or no-shows.
Inspections are held but few sign
The leak is in the home: who's present, how the price is shown, financing.
One source closes far worse than the others
Price that source by cost per signed job, not by cost per lead.
You don't know either number
Start a sheet today: source, held or not, signed or not, price. Four columns.

Your numbers, example inputs

Cost per signed job, from one month of one lead source

Every value below is an example input. Nothing is sent anywhere, and nothing is saved.

%
%
%
Cost per lead
$75
Appointments booked
20.0
Inspections that happened
14.0
Jobs signed
4.2
Revenue from that spend
$63,000
Cost per signed job
$714

What is a good close rate for foundation repair?

There's no audited answer. Published claims run from 15 percent of leads to 35 to 55 percent of inspections. Measure yours both ways and watch the trend rather than a national figure.

Should the spouse be at the inspection?

If both decide, yes. A quote explained to one spouse and retold to the other usually loses detail and urgency.

Does financing raise the close rate?

On big jobs it likely helps, and LeadsuiteNow calls it critical above $15,000. Test it on your own quotes for a quarter and compare.

How do I improve my foundation repair close rate fast?

Get every decision maker home, leave a written estimate the same day and follow up within two days. Those three cost nothing.

Bring both of your close rates to the call, and we'll see where a booked inspection would change the math.

Book My Strategy Call

Sources

  1. LeadsuiteNow says a trained inspector who diagnoses, presents with visuals and offers financing closes 35 to 55 percent of foundation inspections, and calls financing critical for $15,000 and larger projects. LeadsuiteNow.
  2. Minyona prices foundation repair leads at $50 to two hundred dollars per qualified lead, with a one-time setup fee shown as $2,000 (marked down from $4,000, limited time), no monthly retainer, exclusive leads through the contractor's own ad account and a call center that books inspections at no extra charge. Its own example uses a 15 percent close rate. Minyona.
  3. Minyona prices its appointment tier at two to four hundred dollars per booked appointment, with a call center, a 30-day drip and online booking included, and uses a 25 percent close rate in a window contractor example. Minyona.

Read next

Book a Call and See Your Numbers

Your crews do the repair work right, and now it is time to fill the calendar with homeowners ready to book.

  • Ads run in your own ad account, on your own card
  • A text at 60 seconds and a call at 5 minutes, 9 AM to 9 PM
  • Every homeowner owns the house and named a symptom before you see him
  • You pay only when a job signs, never per lead
Book My Strategy Call

Thirty minutes, on your schedule